Arunachal Dam Watch

What exists, what is coming, how much land and forest it takes, and what has gone wrong. Compiled from government records, clearance papers and news reports up to 1 Nov 2026.

About — MW of large hydro runs today, plus — MW of small hydro, and — more projects are planned.

Large hydro (over 25 MW)
—
MW running now; Subansiri Lower counts only its 5 finished units of 8
Projects existing
—
large hydro (over 25 MW) operating or partly operating: Kameng, Panyor Lower, Pare and Subansiri Lower
Small hydro (under 25 MW)
—
MW installed, per Ministry of Power (Dec 2024). There's no official list or count of these plants, so how many exist is not known. Not included in the other figures.
Projects coming up
—
— MW planned, per state govt; — have public records below
Forest land taken
—
hectares in Arunachal, projects built or under construction; Kameng, Panyor Lower and Pare publish no figure
Forest land sought
—
hectares, projects approved or in clearances
Trees cleared for felling
—
permitted for projects built or underway; only Dibang has a published count
Trees to be felled
—
in projects awaiting clearance or construction
People affected by incidents
—
— villages flooded; dam releases, failed flood control and site disasters only
Disasters linked to dams
—
plus — site failures (warning signs)

Capacity by project

Megawatts, every project found, coloured by stage.

Operating Partly operating Under construction Approved Clearances in progress Concurred, not started Survey stage

Forest land by project

Hectares of forest diverted or sought, for every project in the capacity chart. Projects with no published figure are listed at the bottom as data not available.

Operating Partly operating Under construction Approved Clearances in progress Concurred, not started Survey stage

How long each dam took, and what it cost

Bars run from approval or start of work to completion (solid) or target date (faded). The tick marks the originally planned finish. Costs in Rs crore.

Built Still to finish (target) Originally planned finish
Project Stage Start Counted from Planned finish Finished / target Years taken Years late Original cost (Rs cr) Final / latest cost (Rs cr) Cost overrun Notes Source

Data not available means no reliable public figure was found. "Years taken" for unfinished projects counts years so far, to 2026. Panyor Lower and Subansiri Lower are counted from the start of work, the rest from approval, so their years are not strictly comparable. Costs are in the rupees of their own year, not adjusted for inflation.

All projects

Data not available marks figures not found in a reliable source. Tree counts are official figures from clearance papers: "cleared for felling" for projects built or under construction, "to be felled" for those still seeking approval. They are permitted or estimated counts, not trees confirmed cut. "Proposed" is the earliest documented step found (often CEA approval of the project report, so the idea may be older); "Started" is the start of work or government approval; dates and notes in amber are estimates or have gaps. Use the filters and sort controls below, or click a column heading to sort.

Showing — of — projects. Projects with no figure for the sorted column always go to the bottom.

Project District Stage River Developer MW Dam height (m) Total land (ha) Forest (ha) Submerged (ha) Trees cleared / to be felled Proposed Started Finished / target Notes Source

Disasters and site failures by year

Disasters are events that harmed people, land or the river beyond the project site. Site failures stayed within the site but show unstable ground or weak construction. Worker accidents are not included.

Flood from dam release Flood the dam failed to control Disaster at project site Site failure (warning sign)

For many incidents there is no official count of people affected, houses lost, livestock killed or crops damaged, and for some even deaths are uncertain. Project developers rarely publish incident reports, and district flood figures often don't separate a dam release from rain. The real scale of many incidents is likely larger than shown here, so treat these numbers as a minimum.

Disasters linked to dams

Floods caused or worsened by dam releases, floods a dam failed to hold back, and landslides or failures at projects that hit people or the river. Loss of life is noted in each description. Use the filters and sort controls, or click a column heading to sort. Not reported marks a figure no one published. Subansiri Lower sits on the Assam border, and Panyor Lower floods hit Lakhimpur in Assam.

Showing — of — disasters. Disasters with no figure for the sorted column always go to the bottom.

When Project Type People affected Villages flooded Houses destroyed In relief camps Crops hit (ha) River disruption What happened Impact details Source

Site failures: warning signs

Landslides, wall collapses and leaks at project sites that didn't harm anyone outside, but point to unstable ground or weak construction.

When Project Type What happened Source

What this does and doesn't cover

  • The land total is a floor, not a full count. No official source adds up land under all existing dams; operating projects like Panyor Lower and Pare have no published land figures I could find.
  • Project counts, charts and tables cover large hydro only (over 25 MW), the line the Central Electricity Authority uses. Small hydro is shown as one figure: the Ministry of Power's installed capacity as of 31 Dec 2024. No official list or count of the small plants was found, so the number of plants, their land use and any incidents at them are not covered. Dikshi (24 MW) and Khangtang (7 MW), which the state lists as commissioned, are among them.
  • The state's own list of commissioned projects (5, Mar 2026) differs from the "Projects existing" count because it includes those two small plants and leaves out Subansiri Lower, which sits on the Assam border.
  • Flood counts for 2017 and 2021 are district-wide, so they include damage from rain as well as from the dam. They are kept because a dam that releases or fails to hold back water can make a flood worse.
  • "Forest land taken" counts only Arunachal's share; Subansiri Lower diverted another 816 ha in Assam.
  • The state counts 33 projects coming up; the table lists only those with named public records.
  • Worker accidents at construction sites are left out: this dashboard tracks harm to people, land and rivers beyond the projects.
  • Every disaster and site-failure entry cites a news report. Many also cite SANDRP (South Asia Network on Dams, Rivers and People), an advocacy group that tracks dam accidents. Loss of life, where mentioned, is as reported by local media, not an official toll.
  • Dam heights for Dibang (278 m, cut from 288 m) and Siang Upper (~300 m) are as reported; Siang Upper is still at survey stage.

Sources

Every report and record the figures on this page come from.

Government and official records

Projects, land and forest

Disasters, failures and impact